Primary load of the railway station was transmitted through conversion jacking joist to pile foundation.
地铁上方铁路站房的主要荷载由转换托梁传递至桩基承载。
Combined with the construction sequences of the drift and pile method, the idea of zoning, phasing, grouping, and staging is adopted to design the overall jacking scheme.
结合洞桩法施工工序,按“分区、分阶段、分组、分级”原则,制定总体顶升方案。
The application of the chemical churning pile in the existing tracks culvert-jacking box;
结合工程实际,重点介绍了溶洞灌浆、旋喷桩和钢管桩在工程中的运用情况。
应用推荐