Once quoted the CRM will schedule a Gap Analysis audit with the client and assigned Lead Auditor. Gap Analysis audits should be set up as a Special audit job in IQ, and the.
报价以后,客户关系经理就会和客户商议安排一次差异分析审核并指定审核组长。
At the same time, through the analysis of the parallel relation among the multiprocessor parallel job, the low bound of the optimal schedule has been provided.
同时,通过对多处理机任务之间的并行关系的分析,得到了一般最优调度的下界。
应用推荐