In modern thermo-electric plant of large capacity, the backwater heating system and the generator-transformer unit both are the most important parts.
在组成现代大容量热电厂的各主要系统中,回水加热系统和单元机组是热电厂两大重要组成部分。
There are 15 large bulb tubular turbine-generator units with a unit capacity of 42MW in inner and outer river plants of Changzhou Hydraulic Complex.
长洲水利枢纽工程外江、内江厂房共装设15台大型灯泡贯流式水轮发电机组,单机容量42 MW。
应用推荐