The top of the clock tower is leaning one-and-a-half feet off a level position, according to surveyors, and getting worse each year.
据测量人员检测,钟楼顶部已水平偏移1.5英尺(约0.46米),而且情况逐年严重。
Hold tube bend in position, Fig. 5, and mark tube on level with top of hex on compression coupling. Cut off tube at this mark.
将管子弯头握住在位置上,图5,在压紧联轴节上六角顶部标注管道水平位置。
应用推荐