... 甩负荷 load dump (load rejection,load shutdown) 甩负荷试验 load-rejection test (load-shutdowntest) 双层布置 double storey layout ...
基于18个网页-相关网页
load rejection test 抛载试验 ; 甩负荷试验
load-dump test load-rejection test 甩负荷试验
Unit load rejection test 机组甩负荷试验
dynamometry load rejection test 测功法甩负荷试验
Conventional load rejection test 常规法甩负荷试验
Also the purpose, the arrangement schedule of load-rejection test as well as the coordinate relation ship between governing system and speed control system OPC are discussed.
对甩负荷试验的目的、时间安排、调节系统与OPC转速控制系统之间的协调关系等作了探讨。
This article also suggested that detailed operation process of load rejection test and RB test.
提出了机组甩负荷试验和RB试验中锅炉侧的具体操作过程、要点等。
This paper describe the blade stress state of Francis turbine in the course of starting, load rejection, stalling by analysing the field test data.
本文通过分析近期的现场测试数据,给出了混流式水轮机转轮叶片在启动、甩负荷、停机三种过渡工况下的应力状态。
应用推荐