Due to the influence of topography and the environment, traveling carriage is adopted in main girder construction of this bridge.
红枫湖大桥由于受其所处地形和其周边环境的影响,因此该桥主梁的施工方法采用挂篮施工。
This paper expounds the design idea and main contents of construction control system in Self-anchored Suspension Bridge with different girder stiffness.
本文系统地阐述了不同主梁刚度的自锚式悬索桥施工控制系统的设计思路和主要内容。
The length, rigidity and weight of a launching nose have significant influences on the internal forces of incrementally-launched main girder at construction stage.
导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。
应用推荐