Analysis of deflection of main girder of crane is made according to the result of residual stress test.
根据残余应力测试的结果,对起重机主梁的下挠变形进行了分析。
To install the crane span before installation, camber, level of metal structure of main girder bending, trolley rail height difference, gauge deviation, diagonal bridge survey.
安装前要对起重机安装跨度,金属结构主梁的拱度、水平旁弯,小车轨道高低差、轨距偏差,桥架对角线等进行测量。
The results show that the crane is unnecessary to replace for its low total stress level and large strength margin of the main girder (main stressed part).
计算结果指出:门机结构总体应力水平较低,其严重受力件主梁具有较大的强度富裕度,不必更换。
应用推荐