In the closed circulation system of ash-sluicing water of coal-fired power plant, the scaling of the hydraulic ash transport pipes and the backwater pipes is the main problem that need to be solved.
在燃煤电厂冲灰水闭路循环系统中,水力输灰管和回水管的结垢是所需解决的主要问题。
The subsistent main problems in the double material electricity and hydraulic coexisting DEH system of Zhanjiang power plant 300MW Units are described.
主要介绍了双工质电液并存DEH系统在湛江发电厂300MW机组运行中存在的主要问题。
The PWR core thermal-hydraulic design, including the design objective, criteria and main design parameters, specifically that for the Qin-Shan Nuclear Power Plant is described.
本文介绍了压水堆堆芯的热工-水力设计,其中包括了设计任务、准则和主要设计参数,并对秦山核电厂的热工和水力设计作了较详细的描述。
应用推荐