... 这是屏幕的贴膜 » This is the screen foil 主体工程 » main part of the project 我最狠 » I most vicious ...
基于14个网页-相关网页
Throughout the main part of the project each group is asked to maintain a diary of progress made.
在工程的主体施工期间,各组必须保存进度日记。
The facilities for prevention and control of environmental pollution by solid waste shall be checked and accepted simultaneously with the main part of the project.
对固体废物污染环境防治设施的验收应当与对主体工程的验收同时进行。
The plan should be made in the feasibility study stage so that restriction conditions are given by the water and soil conservation plan to the design of main part of the project.
方案的编制应将重点放在开发建设项目的可行性研究阶段,水土保持方案要对主体工程设计提出约束条件。
应用推荐