10CrMo910 main steam pipeline CrMo910主蒸汽管道
In this paper, the fracture process in creep of main steam pipeline is studied by metallographical and fracture mechanics.
本文以金相分析与断裂力学方法研究了主蒸汽管道蠕变破裂过程。
The results show that the graphitization of the bent, HAZ and tee of the main steam pipeline stand is severe, and the relevant components should be replaced.
结果表明,该主蒸汽管道的弯头、焊缝热影响区和三通等部位石墨化严重,部分部件需要更换。
In this paper, high temperature and high-pressure components fitting for life assessment such as main steam pipeline and boiler tube were selected for life management studying.
本课题选取适合寿命评估的高温高压部件,如主蒸汽管道及过热器管进行寿命管理研究。
应用推荐