The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (Master Production Schedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
This paper also analyzes and studies the factors of Master Production Schedule (MPS) and capacity planning, which are integrated with the market trend of Semiconductor industry.
本文结合行业的市场形势,对影响主生产计划(MPS)的因素和产能规划进行了分析研究。
应用推荐