The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.
介绍了多沙河流游荡性河段整治工程措施试验研究课题中浑水系统的研制过程。
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.
而解决浑水管道泥沙淤堵问题的关键在于确定其临界不淤流速及与之配套的工程技术措施。
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.
而解决浑水管道泥沙淤堵问题的关键在于其临界不淤流速的确定。
应用推荐