The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
This paper analysises the sequence of the sections which need to be cured based on ideal point and negative ideal point method in the condition of multi-objective resource constraints.
在资源的多目标限制下,本文引入基于理想点和负理想点的方法对路面的排序进行研究分析。
应用推荐