Several kinds of faults with the EH system that occurred in initial operation period of a native-made 600 MW steam turbine unit were introduced in this paper.
文章介绍了某电厂600 MW汽轮机组投产初期EH系统发生的各种故障,通过对故障进行分析研究,指出故障发生的根本原因及处理方法。
The mathematical model for two-phase flow and heat transfer of wet steam in exhaust pipe for a 600 MW power generating unit with direct air cooling is established.
建立了600 MW发电机组直接空冷排汽管道内湿蒸汽两相流动和传热的数学模型。
The furnace waterwall fouling and slagging of a 200 MW coal fired unit at Fuxin Power Plant is tested and data specimens have been gained.
对辽宁省阜新电厂200 MW机组燃煤锅炉进行了多工况热态测试,获得了数据样本。
应用推荐