Until 2009, China wind power cumulative installed capacity located 2nd position after American and the wind power cumulative 2009 new installed capacity located 1st place all of the world.
截至2009年中国风机总装机量在美国之后位列世界第二,2009年全年新装机量为世界第一位。
In Jiuquan, new coal-fired power plants with 13.6 million kilowatts of installed capacity - the same amount of energy generated by Chile in 2009 - will be added by 2020.
在酒泉,新建的燃煤电站具有1360万千瓦的装机容量-同智力2009年全年的发电量相同-将于2020年投入运行。
China originally aimed to have 30gw of installed renewable capacity by 2020, but new targets are being set because wind alone will soon exceed that goal.
中国原本目标在2020年之前,达到30gw的再生能源装置容量,不过最近中国开始设立新目标,因为光风力发电就能轻易超越原先的目标。
应用推荐