The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
Research indicates that under full load operation of the reservoir, large local tensile stress will be produced at the dam heel and the outlet and inlet of the power penstock.
研究表明,当水库满载运行时,坝踵处产生较大局部拉应力;管道进出口也出现较大局部拉应力。
The ethylene plant of Jilin Chemical Industry CO. Ltd. was expanded in 2005 and put into full-load operation in 2006. The plant was also tested at full load.
中国石油吉林石化公司聚乙烯厂乙烯装置于2005年进行了扩能改造,2006年实现满负荷生产,并在满负荷情况下进行了装置标定。