But the real value of the project will be the ability to map changes in the thickness of the sea ice over time, as further maps are produced.
但是该项目的真正价值是,随着更多地图的出炉,可以绘制海冰厚度随时间变化的地图。
With reference to the gravity survey, this paper describes the schemes of control network layout used with global positioning system (GPS) technique for Donghai Bridge project over sea.
结合重力测量,介绍利用GPS技术进行东海大桥跨海工程控制网的布设技术方案。
An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East sea Bridge Project.
采取何种高效、优质、安全的施工方法完成跨海段非通航孔桥墩承台施工是东海大桥工程建设能否取得成功的关键之一。
应用推荐