... 总生产进度计划 Master Production Schedule 总施工进度 overall construction schedule 项目总进度计划 project master schedule ...
基于22个网页-相关网页
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.
图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
For example, the master single-tier schedule in Figure 10 has the overall Construction phase divided into three six-week periods.
例如,图10中单层的综合图表将整个构建阶段分为三个六周的周期。
We should work according to the overall schedule chart (the construction time schedule) of the project.
我们应该根据工程项目标总进度表(构筑进度表)工作。
应用推荐