After the transformation, the pressure station run well and overhaul period of the equipment was prolonged.
改造后运行状况良好,延长了设备检修周期。
The lifetime of the electrical submersible pumping unit is the main factor affecting the overhaul period of electrical pumping unit.
对电泵井故障模式的调查和统计表明,潜油电泵机组使用寿命是影响电泵井检修周期的主要因素。
By using new type tube arrangement, rationally adjusting support spacing of cooling tubes, and replacing cooling tubes, the old condenser was retrofitted in overhaul period.
通过采用新型排管方式、合理调整冷却管支撑间距,并同时更换冷却管材的方法在大修期内对凝汽器进行了改造。
应用推荐