New Page 9 关键词: 沉桩;孔隙水压力;数值模拟 [gap=595]Key words: piles driven,pore-water pressure,numerical simulation
基于6个网页-相关网页
The three piles are driven 10 to 20 metres into the seabed depending on soil conditions and ice loads.
依据海底土壤和积冰负荷的情况,钢桩会被打入海底10米至20米深。
In this paper driven and jacked piles in non-uniform ground consisting of clayey and silty soils in Shanghai region have been studied.
本文报道了上海地区由粘土和粉砂组成的不均匀地基中的打入桩和压入桩的研究工作。
This paper is to study how the lengths of foundation piles influencing driven piles by one dimensional wave equation.
应用一维波波动方程式探讨基桩长度对打击桩的影响。
应用推荐