Critical clearing time (CCT) is one of the most important stable indices in power system transient stability analysis.
临界切除时间是电力系统稳定问题分析中最重要的稳定指标之一。
In this paper, an introduction of its applications in power system transient stability analysis and control, planning of switching operation, and disturbance diagnosis is presented.
文中对多代理技术目前在电力系统暂态稳定分析与控制、倒闸计划和故障诊断等方面的应用做了概要介绍。
Based on typical complex hydraulic system with upper and lower surge tanks, different models of hydro-turbine and conduit system used in power system transient stability analysis are presented.
以具有上下游调压井的典型复杂水力系统为对象,建立了用于电力系统暂态稳定分析的水轮机和输水系统不同形式的数学模型。
应用推荐