Note that the values in reduction mode have tobe chosen in such a way that the facility has reached the GMP-compliant statein due time before production begins (integration of a time program).
注意,在降低功率的模式下的值的选择必须使得设施在生产开始之前的规定时间内(时间计划结合在其中)达到GMP符合状态。
JET concluded that the F-22 engineering and manufacturing development program would require additional time and funding to reduce risk before the F-22 enters production.
喷气结论的F - 22的工程和制造开发计划将需要更多的时间和资金,以减少风险,然后使用的F - 22进入生产。
Output or production, as of a computer program, over a period of time.
生产量,通过量,吞吐量如计算机程序在一定时间内的输出或成果。
应用推荐