To cope with harsh weather of the region, the project utilizes passive design strategies.
为了应对该地区的恶劣气候,方案采取被动式设计策略。
To cope with harsh weather of the region, the project utilizes passive design strategies.
为了应对该地区严酷的气候,方案采取被动设计策略。
This article is based on the engineering practice summarizes the owner of the project design stage risk management work should focus on issues, and to propose practical coping strategies.
本文在工程实践基础上总结了业主方在工程项目设计阶段风险管理工作中应着重注意的问题,并提出了切实可行的应对策略。
应用推荐