How to determine the scheme of PCC (pumped concrete construction) is one of important subjects in the design on high-rise buildings construction organization.
如何科学地制订混凝土泵送施工方案是高层建筑施工组织设计的很重要的内容之一。
The concrete construction technology for permanent drainage gallery of Xilongchi Pumped Storage Power Station upper reservoir is introduced herein.
详细地介绍了西龙池抽水蓄能电站上水库库底永久排水廊道混凝土的施工技术。
应用推荐