...ipts) 订购倍数(Order Multiple) 废品率(Scrap Factor) MRP 是怎样计算的(二) 物料提前期的计算 采购提前期(Purchase Lead Time) 制造提前期(Manufacture Lead Time) 提前期偏置(Lead Time Offset) 提前期计算(Lead Time Count) 固定提前期 排队时间+准备时间...
基于32个网页-相关网页
The funds will be used to purchase long-lead time materials and major equipment, such as the main reduction gears, in support of the new ship and to perform initial design and planning.
项目资金将用于购买长期材料和主要设备,比如主减速器等,以支持新舰的初步设计和规划。
The customer was inquiring a rough lead time before he could determine whether to purchase. Therefore I didn't place the order.
客户是想知道一个大概收货的时间,才能确定是否购买,所以我没有下订单。
应用推荐