确定一个线程组的ramp-up period (Determine) 图 1。 JMeter 线程组(JMeter Thread Group) 用户思考时间(User think time),定时器,和代理服务器(proxy s...
基于32个网页-相关网页
Each performance test consisted of a ramp-up period, followed by a period with a full user load.
每一个性能测试都由一个过渡时期组成,接着一个全用户负荷时间。
After the ramp-up period, each workload was maintained at "steady state" for at least two hours.
经过了过渡时期,每一个工作负载都会保持在“稳定状态”至少两个小时以上。
We ran each test for approximately 60 minutes in a steady state, with a ramp-up period of 5 minutes.
我们在稳定状态下每次测试运行约60分钟,自举(ramp up)周期为5分钟。
应用推荐