Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
In this article three dimension FEM is adopted in the stress analysis of bottom diversion outlet and notch segment of a RCC gravity dam when flowing design flood.
本文采用三维有限元法,对碾压混凝土坝底孔缺口坝段在过流情况下,顶部未到设计龄期的碾压混凝土和大型导流底孔周边的应力分布进行了分析。
Because of high temperature in South China, it is necessary to solve many difficult scientific problems in order to construct the highest RCC gravity dam in the world.
在我国南方高气温地区建造世界上最高的RCC重力坝,需攻克许多科技难题。
应用推荐