The supply of irrigation water to the downstream from the Huangfeng canal was cut off during construction of the right bank dam of Suzhi hydropower project.
苏只水电站右岸坝体施工,截断了黄丰渠向下游灌溉供水,为了避免断水,需要采取临时供水措施解决下游灌溉用水问题。
The shifting of the whole dam to right bank after dam grouting was caused by the temperature difference of the banks.
大坝在封拱之后、整体向右岸侧移,其成因经分析认为系二岸温差所致,并将引起较大的坝体应力。
The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.
三峡工程第三期截流工程是确保实现初期围堰挡水发电及同时修建右岸大坝和电厂的关键性工程。
应用推荐