river realignment works 河流改道工程
river channel realignment 黄河河道整治
The results indicate that the fund raising model supplies a feasible scheme for the investment and benefit distribution in river realignment project.
结果表明,本文的资金分摊模型为内河航道建设的合理筹资和利益分配提供了一个可行的方案。
The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.
介绍了多沙河流游荡性河段整治工程措施试验研究课题中浑水系统的研制过程。
应用推荐