roller compacted concrete dam rcc 碾压混凝土坝
RCCD roller compacted concrete dam 碾压混凝土坝
high roller compacted concrete dam 高碾压混凝土坝
Guanyinge Roller Compacted Concrete Dam 观音阁碾压混凝土坝
roller-compacted concrete gravity dam 碾压混凝土重力坝
The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.
碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.
理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。
应用推荐