thick sand and gravel layer 深厚砂砾石层
The invert siphon project in Zhongyishui lies in the sand and gravel layer, with rich groundwater and high seepage coefficient.
中易水倒虹吸工程建筑物所处地层为砂卵层,地下水丰富,渗透系数大。
The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.
小浪底主坝防渗墙是坝基砂砾石覆盖层渗流控制的关键工程,最深达80多米。
The cushion layer for the dam is constructed with the material prepared mainly with natural sandy gravel and mixed with proper amount of pebble and coarse sand.
大坝垫层料采用以天然砂砾料为主、掺入小石和粗砂以调整级配的方式生产。
应用推荐