It is the first time that large-area manually excavated piles were applied as the foundation of? Structure? In ship-building berth project.
在船台工程上大面积使用人工挖孔桩作为结构的基础在国内尚属首次。
In Wuhu Jiangdong Ship Building Factory, a new building berth and chute are established on the slope with thick soft under layer.
芜湖江东船厂新建船台滑道位于有较厚软弱土层的岸坡上,软弱土层强度低,岸坡的变形过大将危及工程结构的安全。
Building berth is the fixed ground support and launching-cradle is only used while launching. The latter will be sliding together with the ship into the water.
船台是固定的地面支撑,下水支架仅用于下水时。后者在下水时与船体一起滑入水中。