As the installed capacity and the unit capacity continuously expand, the requirements on a control system become more and more high.
随着装机容量和单机容量的不断扩大,对控制系统的要求也越来越高。
Regulation system was installed on a real reciprocating compressor on the base of element experiment. Capacity stepless regulation was achieved in the lab.
在原理性试验的基础上,将调节系统安装在一真实压缩机上,在实验室实现排气量全量程的无级调节。
Image processing technology is used to furnace flame detection in this thesis. The furnace flame detection system can be installed in that unit whose capacity is less than 200mw.
本文考虑把图像处理技术应用于炉膛火焰检测,在容量小于200 MW的机组上安装全炉膛火焰检测系统。
应用推荐