The results indicate that: (1) the character of saturation line change has a time lag of the water level of tailings impoundment;
试验结果发现:尾矿堆积坝的浸润线变化存在滞后性;
The application of the gravel pile facilities in anti-liquefaction treatment for the loess foundation ata uranium tailings impoundment is introduced.
介绍了排水减压措施在某铀尾矿库黄土状粉土地基抗液化处理中的应用及处理效果。
应用推荐