As nonlinear factor of displacement is not taken into account in design of thermal overhead pipeline previously, actual stress condition of pipeline and support can't be reacted correctly.
原先热力架空管道的计算没有考虑到位移的非线性因素,不能正确地反映管道和支座的实际受力情况,现结合热力架空管道和支座的受力情况,给出了力学的计算模型。
The three modes are systematic and holistic in the actual application. Be taken into account the application of the three modes.
这三种模式是一个系统的、整体的方法,在实际的运用中对于具体问题要综合考虑三种模式的应用。
In actual state, the change of the embedded point and the characteristic of the reverse catenary are taken into account. This paper will propose the concept of effective length of the drag line.
实际状态下,考虑嵌入点的变化和嵌入缆的反悬链特性,提出了拖曳缆有效缆长的概念。
应用推荐