Aiming at the total weighted tardiness scheduling problem of unrelated parallel machine, a kind of hybrid ant colony optimization algorithm was proposed.
针对一类变速机总加权拖期调度问题,提出一种混合蚁群优化算法。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
应用推荐