... Taking-over Certificate 接收证书(证明工程按照合同实质竣工,进入缺陷通知期) Tests after Completion 竣工后检验 Defects Notification Period 缺陷通知期 维修期 ...
基于34个网页-相关网页
对生产设备的“竣工试验”(Tests on Completion), “竣工后试验”(Tests after Completion)、 “启动前试验”(Pre-commissioning Test)、 “启动试验”(Commissioning Test)以及“试运行”(Trial Operation),都做了详细...
基于28个网页-相关网页
... testing 测试 tests after completion 完工后的测试 tests after completion,dealyed 延期的完工后测试 ...
基于12个网页-相关网页
Then the Works or Section shall be deemed to have passed these Tests after Completion.
则该工程或分项工程应被视为已通过了这些竣工后试验。
Tests to be carried out after completion of all works affecting the water tightness and before fitting the floor covering, the insulation, the lining etc.
该试验应在水密试验完成后和在装配地板敷料,绝缘材料,衬板等前进行。
Unless otherwise agreed, Tests on Completion of Design-Build shall be carried out within 14 days after this date, on such day or days as the Employer's Representative shall instruct.
除非另有商定,此类试验应在该日期后14天内于业主代表指示的某日或数日内进行。