The coal roadway driving is a "bottleneck" problem of influencing and restricting the normal replacement of mining and driving in the outburst mines.
煤巷掘进一直是影响和制约突出矿井采掘正常接替的“瓶颈”问题。
The measurement method is demonstrated valid in outburst elimination by the examination of remnant gas pressure, pre-drainage rate and the zonal verification during the coal roadway driving.
残余瓦斯压力和预抽率的检验以及煤巷掘进期间的区域验证,均证明按该方法布置的预抽钻孔,消突效果有效。
The combined support with cable bolt wire mesh and shotcreting is applied in coal roadway in Xingan coal Mine of Hegang Mining Industry Group.
鹤岗矿业集团兴安煤矿在煤巷中应用锚索锚杆挂网喷喧支护,取得了较好的技术经济效果。
应用推荐