By means of arch and girder load sharing to compute the dam body stress.
对坝体应力采用拱梁分载法进行计算。
The computation of the dam body stability is an important content in a tailing pond safety assessment.
坝体稳定性计算是尾矿库安全评价中的一项重要内容。
Soil organic matter content increases gradually from upstream to downstream in the gully with seabuckthorn flexible dams and in the dam body.
沟道及沙棘柔性坝的土壤有机质含量在纵向大致呈现由上游到下游缓慢递增的过程。
应用推荐