The design principle and the structure of the steel platform for the construction of Hangzhou Bay Bridge are introduced and the major problems and points of attention are pointed out.
介绍了杭州湾跨海大桥桩基施工钢平台的设计原则、钢平台的构造和设计,同时指出了钢平台施工中应注意的主要问题。
In the paper, the surveying technique of the bridge is introduced, the application of total station instrument in piling of Hangzhou Bay Major bridge is discussed.
本文介绍了杭州湾跨海大桥控制测量技术,讨论了在近海区利用全站仪对常规打桩船打桩的测量技术和在离海岸较远时利用GPS打桩系统打桩的方法。
应用推荐