1条评论 - 发文时间: 2007年10月17日《铁三角》(The Iron Triangle),天地♀涂鸦的网易博客,我要的世界,与众不同;我要的色彩,五彩斑斓!,有点复杂,但绝非无趣!
基于608个网页-相关网页
The three vertices of the iron triangle collapse into one vertex of the Agile triangle called constraints.
传统铁三角的三个顶点转变为“敏捷三角形”的一个顶点,被称为约束。
Thus, according to Jim, Agile teams should focus on the releasable product rather than getting constrained by the iron triangle.
因此,在Jim看来,敏捷团队应该将关注点放在可发布的产品上,而不是被传统铁三角限制住。
And so, even if bills are eventually passed, the "iron triangle" is reinforced, and any attempts to reform the system become harder. Or go up in smoke.
因此,即使法案能最终通过,“铁三角”的势力也得到了进一步强化,那么任何改变体制的尝试都将变得更加艰难,或者随烟飘散。
应用推荐