... 5.采购和生产活动控制(Purchasing and production activity control) 主计划(The master production schedule) 销售和经营计划(SOP) ...
基于1个网页-相关网页
Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (Master Production Schedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。