The transverse deformation of the billet was divided into four areas.
研究发现坯料的横向变形分为四个的区域。
According to the plate butt welding of A105 steel, the transverse deformation was real-time measured during welding.
通过A105钢的平板对接试验,对焊接过程中焊接横向变形进行实时测量。
The transverse deformation of entiretied and constructed tunnel are both in the elastic limit corruptstate, the solution of the maximum and minimum of the segments'cross-section radius.
装配式、整体式隧道横向变形处于弹性极限破坏状态,管片环横截面极限半径最大值、最小值。
应用推荐