... Three Gorges Project Hotel 三峡工程大酒店 Three Gorges Project lock 三峡船闸 The Three Gorges Dam project 三峡堤坝工程 ; 三峡大坝工程 ...
基于1个网页-相关网页
The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .
介绍了三峡工程永久船闸地面混凝土在1999年夏季施工中所进行的各种温控措施。
The characteristic line method is used to simulate the characteristics of the water conveyance system of the ship lock in the Three-Gorges Project.
利用等时段的特征线法数值模拟三峡永久船闸输水系统不补水工况下的输水特性,得出了输水管道沿程各节点水头及流量的变化规律。
The paper has analyzed the rock deformation monitoring result of the double-line five-grade ship lock middle-isolated pier in Three Gorges Project.
本文对三峡双线五级船闸中隔墩岩体变形监测资料进行了分析。
应用推荐