The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .
介绍了三峡工程永久船闸地面混凝土在1999年夏季施工中所进行的各种温控措施。
The welding process and method for the inverted-V gate of the permanent ship lock of Three Gorges project is outlined in this paper.
介绍了“三峡永久船闸人字门”焊接工艺过程及所采用的方法。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。