3进度计划表示方法1横道图(Gantt chart)2里程碑图(milestone chart)3网络图4时标网络图(time coordinate network)项目费用管理1过程和步骤1编制资源计划—通过分析和识别,确定项目需要投入的资源种类和数量。
基于28个网页-相关网页
no time-coordinate network 非时标网络计划
The 'time scale network' was worked out by building the dual-code network plan into the time coordinate, which can make the network graph more readable.
将双代号网络计划放在时间坐标里,编制成“时标网络”,使网络图的识读变得容易。
By analyzing the method of drawing up classical time - coordinate network figure, the authors present a practical improved drawing method in this paper.
在分析传统时标网络图编制方法的基础上,通过编制实践,提出了一种实用改进型的双代号时标网络图的编制方法。