Negative Total Float 负总浮动时间
TF Total Float 总浮动时间
Total Float Time 总浮时
Total Float TF 总时差
total float theorem 总时差定理
TF Total Float or 总浮时或目标完
Utilise the Total Float times 尽量利用所有空间时间
Total float for the activity is 9 days.
该项工作总时差为9天。
The each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.
工作的总时差是工作的最主要时间参数之一,是网络图中关键工作和关键线路的判别依据。