Total cost management is a method of cost management orienting the 21st century. At present, it consists of total process, total factor, total risk and total team management.
全面造价管理是面向21世纪的造价管理方法,目前它是集全过程、全要素、全风险和全团队为一体的造价管理。
The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.
本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。