... 总试验时间 total time on test 总试验时间变换 total-time-on-test transformation 地面试验时间优化软件 DYNAWORKS ...
基于20个网页-相关网页
The total time spent on the problem was approximately five days of our time, plus another 10 to 20 days for their developers to code and test the successful new approach.
解决这个问题共花费了我们大约5天时间,再加上他们的开发人员编码和测试成功的新方法又用了10到20天时间。
A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.
以总试验时间为检验统计量,在定时截尾寿命试验下研究GBVE分布产品失效率的抽样检验方案,随机模拟结果显示此方法有效。
A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.
本文给出了制定定时截尾寿命试验下指数分布产品失效率的抽样检验方案的一个新方法,检验统计量是总试验时间。
应用推荐