An explosion blew the roof and outer walls off of the number 3 unit Monday at the Fukushima nuclear power plant in earthquake-stricken northern Japan.
日本北部遭受地震的福岛核电站星期一发生爆炸,炸毁了3号机组的外墙和屋顶。
This paper introduces the application and energy saving result after unit 2 of Zhangjiakou Power Plant adopted less oil ignition and low load stable combustion technology.
介绍张家口发电厂2号机组采用少油冷炉点火和低负荷稳燃技术后的使用情况和节能效果。
Heat deviation analytical method is adopted, which is used to analyze the influences which the main operational monitored parameters have on the economic performance of the power plant unit.
采用热偏差分析方法,分析了锅炉主要运行可监控参数对机组经济性的影响。
应用推荐